| Small Portable / Light Commercial | 5–20 kVA | 230/400 V, 3-phase; 120/240 V options | 50 or 60 Hz | Small worksites, retail backup, pumps, and temporary power | IEC 60204-1; local electrical installation rules | ISO 8528 for engine-generator performance; ISO 9001 is commonly requested for manufacturing control | Emission requirements depend on the destination country and engine category; confirm certification before shipment | Diesel; gasoline models are also available in the lower-output range | Approximately 1.5–4.5 L/h for diesel units | Typically 8–12 hours with a standard tank | 180–650 kg | Approximately 1.2–1.8 m² floor area | Usually suitable for consolidated cargo or small crate shipments; protect control panels and alternators from moisture | Local spare filters, battery support, wiring diagrams, and clear startup instructions |
| 20–60 kVA | 20–60 kVA | 400/230 V or 480/277 V, 3-phase | 50 or 60 Hz | Construction sites, farms, offices, and small commercial facilities | IEC 60034; IEC 60204-1; destination-country electrical codes | ISO 8528; factory testing should include voltage, frequency, load response, and insulation checks | Some markets require certified non-road diesel emissions compliance; requirements may differ for standby and prime applications | Diesel | Approximately 4–13 L/h at 75% load | Typically 8–16 hours, depending on tank size and load profile | 600–1,800 kg | Approximately 2–4 m² floor area | Check forklift pockets, lifting points, crate dimensions, and maximum allowable gross weight for inland transport | Regional service coverage, automatic transfer-switch compatibility, and replacement battery availability |
| 60–150 kVA | 60–150 kVA | 400/230 V or 480/277 V, 3-phase | 50 or 60 Hz | Medium construction projects, hotels, workshops, and backup power systems | IEC 60034; IEC 61439 may apply to associated low-voltage assemblies | ISO 8528-5 for generating-set performance; documented load-bank testing is recommended | Verify the applicable stage or national emissions rule, especially for continuous operation in urban areas | Diesel | Approximately 12–32 L/h at 75% load | Typically 8–24 hours with an extended base tank | 1,500–3,800 kg | Approximately 4–7 m² floor area | Confirm whether the set can ship as breakbulk, flat-rack, or containerized cargo; account for service access around the unit | Commissioning assistance, load-bank testing, controller configuration, and preventive-maintenance schedules |
| 150–300 kVA | 150–300 kVA | 400/230 V, 415/240 V, or 480/277 V, 3-phase | 50 or 60 Hz | Factories, data and telecommunications sites, hospitals, and large commercial buildings | IEC 60034; IEC 60529 enclosure protection may apply to control equipment | ISO 8528-5; testing should cover transient voltage, frequency recovery, and step-load performance | Emission certification, exhaust design, and after-treatment requirements must be checked for the final installation location | Diesel | Approximately 30–65 L/h at 75% load | Typically 8–24 hours; external fuel systems may be required for longer autonomy | 3,000–6,500 kg | Approximately 7–12 m² floor area | Pre-shipment dimensional drawings are essential; review crane capacity, door clearance, and port handling limits | 24/7 technical escalation, controller spare parts, remote monitoring integration, and trained commissioning personnel |
| 300–800 kVA | 300–800 kVA | 400/230 V, 415/240 V, or medium-voltage output through a transformer | 50 or 60 Hz | Industrial plants, large infrastructure projects, utilities, and mission-critical facilities | IEC 60034; IEC 61439 for low-voltage switchboards; local fire and fuel-storage regulations | ISO 8528-5 with witnessed factory acceptance testing recommended for critical applications | Local emissions limits may require selective catalytic reduction, diesel oxidation catalysts, particulate controls, or operating permits | Diesel | Approximately 60–170 L/h at 75% load | Typically 8–24 hours using dedicated day tanks or bulk-fuel systems | 6,000–15,000 kg | Approximately 12–25 m² floor area | Route surveys, lifting plans, customs documentation, marine insurance, and oversized-cargo permits may be required | Multi-year parts planning, field service agreements, synchronization engineering, and operator training |
| 800–2,000 kVA | 800–2,000 kVA | Low-voltage or medium-voltage output, subject to project design | 50 or 60 Hz | Power stations, mining, large manufacturing, hospitals, and data-center campuses | IEC 60034; IEC 61439; applicable grid-interconnection and protection requirements | ISO 8528-5; full-load and step-load factory acceptance testing should be contractually defined | Permitting, exhaust dispersion, acoustic limits, and fuel-storage rules can materially affect the project design | Diesel; gaseous-fuel alternatives may be evaluated for fixed installations | Approximately 160–420 L/h at 75% load | Normally designed around an engineered bulk-fuel system rather than an integral tank | 12,000–35,000 kg | Approximately 25–60 m² floor area, excluding service clearances | Project logistics should include route engineering, port lifting capability, modular shipment planning, and on-site assembly | Guaranteed response times, regional parts inventory, remote diagnostics, protection studies, and long-term maintenance support |