| 1 | Micro HDD Rig | Short, small-diameter utility installations, such as service connections and landscaping work. | Useful where access and working space are limited; verify that the planned bore and product pipe are within the rig’s capacity. | Check entry-pit requirements, locating-system compatibility, rod condition, and availability of suitable tooling. |
| 2 | Mini HDD Rig | Small utility crossings, including water, communications, and electrical conduit installations. | A practical choice for residential or light commercial work when a larger rig would be difficult to position. | Review thrust and pullback specifications, rod length, setup footprint, and the condition of the drilling-fluid system. |
| 3 | Compact HDD Rig | Urban utility work and routine service crossings that need more capacity than a small rig can provide. | Can suit constrained sites, but access routes, overhead clearance, and spoil management still need planning. | Inspect the clamp system, controls, service history, transport dimensions, and compatibility with available locating equipment. |
| 4 | Mid-Size HDD Rig | Municipal and commercial installations, including longer utility crossings and larger product pipes. | Often selected for mixed utility workloads; ground conditions and bore length determine the required tooling and fluid support. | Compare rated pullback, thrust, torque, rod capacity, fluid-pump requirements, and transport arrangements. |
| 5 | Maxi HDD Rig | Large-diameter or long-distance crossings for major utilities and infrastructure projects. | Requires substantial setup space, careful bore planning, and coordinated drilling-fluid and pipe-handling operations. | Verify the complete system capacity, including rig, drill string, tooling, fluid equipment, support plant, and site logistics. |
| 6 | Rock-Capable HDD Rig | Projects that may encounter hard or abrasive formations and require rock-drilling tooling. | Rock performance depends on the formation and the full drilling assembly; a rig alone does not establish ground capability. | Confirm compatibility with the planned rock tooling, downhole motor where required, drill pipe, fluid pumps, and steering system. |
| 7 | All-Terrain HDD System | Crossings expected to pass through changing or variable ground conditions. | Requires a system configured for the anticipated formations; tooling and drilling practices must match the ground investigation. | Ask which downhole assemblies and steering methods are supported, and confirm the system’s limits for the project geology. |
| 8 | Trailer-Mounted HDD Rig | Contractors needing a towable package for moving between jobs and setting up at accessible sites. | Check towing access, ground bearing conditions, stabilisation needs, and space for the rig and support equipment. | Inspect the trailer, brakes, tyres, hitch, legal transport requirements, and whether the package includes essential accessories. |
| 9 | Track-Mounted HDD Rig | Worksites where tracked mobility helps position the rig across uneven or unpaved ground. | Track mobility does not replace site-access planning; assess ground pressure, slopes, turning space, and transport loading. | Check track and undercarriage wear, controls, transport weight, service access, and the manufacturer’s operating limits. |
| 10 | Modular or Remote-Power HDD System | Sites where separating the power unit from the drill can help with layout, access, or equipment placement. | Useful in some confined or sensitive locations; hose routing, ventilation, noise, and site-specific rules remain important. | Confirm hydraulic compatibility, hose length and condition, control connections, power-unit requirements, and included modules. |